IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,641

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0389 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,384 $3,000 Implemented
OR0389 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,103 $590 Implemented
SF0209 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $0 Not Implemented
SF0209 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,820 $1,680 Not Implemented
SF0209 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,837 $2,354 Not Implemented
SF0209 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,930 $18,128 Not Implemented
SF0209 # 05 Y:2001 05 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $1,184 $4,100 Not Implemented
SF0209 # 06 Y:2001 06 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $1,508 Not Implemented
SF0209 # 07 Y:2001 07 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $165 $36 Not Implemented
SF0209 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $3,276 $110 Not Implemented
MA0477 # 01 Y:2000 01 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $22,890 $2,000 Not Implemented
MA0477 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $21,290 $103,000 Not Implemented
MA0477 # 03 Y:2000 03 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,580 $21,000 Not Implemented
MA0477 # 04 Y:2000 04 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,910 $0 Not Implemented
MA0477 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,200 $11,700 Implemented
MA0477 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $410 $500 Implemented
OR0373 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,100 $0 Implemented
OR0373 # 02 Y:2000 02 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $262 $0 Implemented
OR0373 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,186 $630 Not Implemented
OR0373 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,115 $11,205 Implemented
OR0373 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,083 $6,300 Not Implemented
OR0373 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $950 $2,700 Not Implemented
OR0373 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $244,000 $110,000 Not Implemented
MO0295 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,207 $12,145 Not Implemented
MO0295 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,737 $1,525 Not Implemented