Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,641
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0081 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,532 | $8,570 | Not Implemented |
SD0081 # 02 Y:1994 | 02 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,629 | $500 | Not Implemented |
SD0081 # 03 Y:1994 | 03 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $210 | $750 | Not Implemented |
SD0081 # 04 Y:1994 | 04 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $528 | $95 | Not Implemented |
SD0081 # 05 Y:1994 | 05 | 1994 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $14,721 | $800 | Not Implemented |
SD0081 # 06 Y:1994 | 06 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,357 | $11,600 | Not Implemented |
SD0081 # 07 Y:1994 | 07 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,089 | $13,406 | Not Implemented |
SD0081 # 08 Y:1994 | 08 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $599 | $60 | Not Implemented |
SD0081 # 09 Y:1994 | 09 | 1994 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,313 | $2,705 | Not Implemented |
SD0081 # 10 Y:1994 | 10 | 1994 | INSTALL OCCUPANCY SENSORS | $1,343 | $3,680 | Not Implemented |
CO0298 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,190 | $4,420 | Not Implemented |
CO0298 # 02 Y:1994 | 02 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,060 | $120 | Implemented |
CO0298 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,900 | $1,900 | Implemented |
CO0298 # 04 Y:1994 | 04 | 1994 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,390 | $250 | Implemented |
CO0298 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $970 | $2,060 | Not Implemented |
CO0298 # 06 Y:1994 | 06 | 1994 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $580 | $1,240 | Not Implemented |
CO0298 # 07 Y:1994 | 07 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $480 | $800 | Implemented |
CO0298 # 08 Y:1994 | 08 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $440 | $200 | Implemented |
CO0298 # 09 Y:1994 | 09 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $270 | $340 | Implemented |
SD0076 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,070 | $3,970 | Implemented |
SD0076 # 02 Y:1994 | 02 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,732 | $20 | Implemented |
SD0076 # 03 Y:1994 | 03 | 1994 | INSULATE BARE EQUIPMENT | $263 | $512 | Implemented |
SD0076 # 04 Y:1994 | 04 | 1994 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,814 | $1,235 | Not Implemented |
SD0076 # 05 Y:1994 | 05 | 1994 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $3,031 | $3,180 | Implemented |
SD0076 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,666 | $1,516 | Implemented |