Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
202
matching recommendationsSIC | 2833 | Medicinals And Botanicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0255 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,849 | $4,680 | n/a |
UU0255 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,932 | $60,862 | n/a |
UU0255 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $10,948 | $4,085 | n/a |
UU0255 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,033 | $8,000 | n/a |
UU0255 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,750 | $4,964 | n/a |
UU0255 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,299 | $2,614 | n/a |
UU0255 # 01 Y:2024 | 01 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $64,548 | $8,000 | n/a |
UU0255 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,674 | $8,711 | n/a |
AS0579 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $135 | $217 | n/a |
AS0579 # 05 Y:2024 | 05 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $166 | $566 | n/a |
AS0579 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,355 | $861 | n/a |
AS0579 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $878 | $473 | n/a |
AS0579 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $144 | $350 | n/a |
AS0579 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,223 | $783,210 | n/a |
AS0579 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,091 | $2,514 | n/a |
AS0566 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $404 | $496 | Implemented |
AS0566 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,411 | $463 | Implemented |
AS0566 # 05 Y:2023 | 05 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $193 | $667 | Implemented |
AS0566 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $180 | $44 | Not Implemented |
AS0566 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,582 | $284,735 | Implemented |
AS0566 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $1,673 | $3,459 | Implemented |
UU0221 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $280 | $965 | Not Implemented |
UU0221 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,675 | $25,694 | Not Implemented |
UU0221 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,523 | $21,923 | Not Implemented |
UU0221 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $6,221 | $11,385 | Implemented |