IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 2833 Medicinals And Botanicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0579 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $135 $217 n/a
AS0579 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $144 $350 n/a
AS0579 # 05 Y:2024 05 2024 REDUCE HEAT GAIN BY WINDOW TINTING $166 $566 n/a
AS0579 # 04 Y:2024 04 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $878 $473 n/a
AS0579 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,091 $2,514 n/a
AS0579 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $5,355 $861 n/a
AS0579 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,223 $783,210 n/a
AS0566 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $44 Not Implemented
AS0566 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $193 $667 Implemented
AS0566 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $404 $496 Implemented
AS0566 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,411 $463 Implemented
AS0566 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $1,673 $3,459 Implemented
AS0566 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,582 $284,735 Implemented
AS0469 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,578 $900 Not Implemented
AS0469 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,906 $420 Not Implemented
AS0469 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $4,029 $14,835 Not Implemented
AS0469 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,730 $10,305 Not Implemented
AS0469 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,924 $37,163 Not Implemented
AS0236 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,320 $12,169 Not Implemented
AS0236 # 12 Y:1998 12 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $1,487,526 $600,000 Not Implemented
AS0236 # 11 Y:1998 11 1998 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $46,400 $2,180 Not Implemented
AS0236 # 10 Y:1998 10 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $6,934 $1,560 Not Implemented
AS0236 # 09 Y:1998 09 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $120 $60 Not Implemented
AS0236 # 08 Y:1998 08 1998 INSTALL TIMERS AND/OR THERMOSTATS $3,018 $1,725 Not Implemented
AS0236 # 07 Y:1998 07 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,433 $9,200 Not Implemented