Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 2836 | Biological Products Exc. Diagnostic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0389 # 04 Y:2001 | 04 | 2001 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,384 | $3,000 | Implemented |
OR0389 # 02 Y:2001 | 02 | 2001 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $29,980 | $20,000 | Implemented |
OR0389 # 01 Y:2001 | 01 | 2001 | MODIFY CURRENT INCENTIVE PROGRAM | $289,800 | $26,680 | Implemented |
SD0083 # 11 Y:1994 | 11 | 1994 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $432 | $125 | Implemented |
SD0083 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,108 | $100 | Implemented |
SD0083 # 02 Y:1994 | 02 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $4,183 | $320 | Implemented |
SD0083 # 03 Y:1994 | 03 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $85 | $40 | Implemented |
SD0083 # 06 Y:1994 | 06 | 1994 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,046 | $240 | Implemented |
SD0083 # 08 Y:1994 | 08 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,678 | $330 | Implemented |
SD0083 # 10 Y:1994 | 10 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $748 | $385 | Implemented |
IA0037 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,697 | $2,500 | Implemented |
IA0037 # 06 Y:1992 | 06 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,046 | $3,050 | Implemented |
KU0273 # 01 Y:1989 | 01 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $25,620 | $38,400 | Implemented |
KU0273 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,859 | $2,558 | Implemented |
KU0273 # 04 Y:1989 | 04 | 1989 | KEEP BOILER TUBES CLEAN | $3,005 | $1,500 | Implemented |
KU0273 # 03 Y:1989 | 03 | 1989 | INSTALL TURBULATORS | $5,599 | $5,760 | Implemented |
KU0273 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,343 | $1,400 | Implemented |
KU0266 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $282 | Implemented |
KU0266 # 09 Y:1988 | 09 | 1988 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $396 | $580 | Implemented |
KU0266 # 07 Y:1988 | 07 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $898 | $1,500 | Implemented |
KU0266 # 02 Y:1988 | 02 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,274 | $1,008 | Implemented |
KU0266 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,624 | $100 | Implemented |
KU0266 # 05 Y:1988 | 05 | 1988 | RECOVER AND REUSE COOLING WATER | $791 | $860 | Implemented |
KU0175 # 03 Y:1985 | 03 | 1985 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $875 | $22 | Implemented |
KU0175 # 01 Y:1985 | 01 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,551 | $484 | Implemented |