Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsSIC | 2836 | Biological Products Exc. Diagnostic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0115 # 03 Y:2017 | 03 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,532 | $17,600 | Not Implemented |
WM0115 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,509 | $3,740 | Not Implemented |
WM0115 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $212 | $550 | Not Implemented |
CO0696 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $310 | $480 | Implemented |
CO0696 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,870 | $6,360 | Not Implemented |
CO0696 # 02 Y:2014 | 02 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,140 | $500 | Implemented |
CO0696 # 01 Y:2014 | 01 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $9,930 | $22,200 | Not Implemented |
SF0442 # 01 Y:2014 | 01 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,021 | $0 | Implemented |
SF0442 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,864 | $2,722 | Implemented |
SF0442 # 03 Y:2014 | 03 | 2014 | ADD AREA LIGHTING SWITCHES | $409 | $252 | Not Implemented |
SF0442 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,082 | $12,459 | Implemented |
SF0442 # 05 Y:2014 | 05 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $231 | $1,559 | Implemented |
SF0442 # 06 Y:2014 | 06 | 2014 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,162 | $173,094 | Not Implemented |
NC0470 # 11 Y:2012 | 11 | 2012 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $1,331,790 | $2,000,000 | Not Implemented |
NC0470 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,181 | $151,669 | Implemented |
NC0470 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,967 | $85,750 | Not Implemented |
NC0470 # 04 Y:2012 | 04 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $671 | $1,100 | Implemented |
NC0470 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,234 | $33,182 | Not Implemented |
NC0470 # 07 Y:2012 | 07 | 2012 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $12,321 | $36,400 | Not Implemented |
NC0470 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,336 | $1,200 | Implemented |
NC0470 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $883 | $1,575 | Implemented |
NC0470 # 01 Y:2012 | 01 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,179 | $0 | Implemented |
NC0470 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,916 | $18,000 | Not Implemented |
NC0470 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,091 | $400 | Not Implemented |
DL0062 # 05 Y:2010 | 05 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,400 | $15,300 | Not Implemented |