Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2012 |
Principal Product | Pharmaceuticals |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2836 - Biological Products Exc. Diagnostic |
Sales | >$500,000,000 |
# of Employees | 2,300 |
Plant Area (Sq.Ft.) | 872,000 |
Annual Production | 9,450 Thousand Gallons |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,145,041 | 93,563,480 | kWh | $0.03 |
Electricity Demand | $2,333,921 | 152,918 | kW-months/year | $15.26 |
Electricity Fees | $651,725 | - | $ | - |
Natural Gas | $1,983,889 | 378,705 | MMBtu | $5.24 |
TOTAL ENERGY COSTS | $9,614,576 | |||
RECOMMENDED SAVINGS* | $1,449,569 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,250 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $1,179 Cost: - |
- | - | - | - | $1,179 | 180 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,179 180 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $11,916 Cost: $18,000 |
- | - | - | - | $11,916 | 2,274 | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,916 2,274 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,336 Cost: $1,200 |
- | - | - | - | $1,336 | 255 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,336 255 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $671 Cost: $1,100 |
- | - | - | - | $671 | 128 | - | - | - | - |
- - kWh |
- - kW-months/year |
$671 128 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,091 Cost: $400 |
$3,190 | 94,920 | $1,901 | 136 | - | - | - | - | - | - |
$3,190 94,920 kWh |
$1,901 136 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $35,967 Cost: $85,750 |
- | - | - | - | $35,967 | 6,864 | - | - | - | - |
- - kWh |
- - kW-months/year |
$35,967 6,864 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $12,321 Cost: $36,400 |
$400 | 11,913 | - | - | $11,921 | 2,275 | - | - | - | - |
$400 11,913 kWh |
- - kW-months/year |
$11,921 2,275 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $39,181 Cost: $151,669 |
$19,240 | 572,451 | $19,941 | 1,422 | - | - | - | - | - | - |
$19,240 572,451 kWh |
$19,941 1,422 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,234 Cost: $33,182 |
$4,478 | 133,241 | $2,669 | 191 | - | - | - | - | $2,087 | - |
$4,478 133,241 kWh |
$2,669 191 kW-months/year |
- - MMBtu |
- - lb |
$2,087 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $883 Cost: $1,575 |
$259 | 7,695 | $359 | 26 | - | - | - | - | $265 | - |
$259 7,695 kWh |
$359 26 kW-months/year |
- - MMBtu |
- - lb |
$265 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $1,331,790 Cost: $2,000,000 |
$(-5,888) | (-175,200) | $(-3,365) | (-240) | $(-16,537) | (-3,156) | $1,357,580 | 4,200,000 | - | - |
$(-5,888) (-175,200) kWh |
$(-3,365) (-240) kW-months/year |
$(-16,537) (-3,156) MMBtu |
$1,357,580 4,200,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,449,569 Cost: $2,329,276 |
$21,679 | 645,020 | $21,505 | 1,535 | $46,453 | 8,820 | $1,357,580 | 4,200,000 | $2,352 | - | $21,679 645,020 kWh |
$21,505 1,535 kW-months/year |
$46,453 8,820 MMBtu |
$1,357,580 4,200,000 lb |
$2,352 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,250 Cost: $155,544 |
$19,499 | 580,146 | $20,300 | 1,448 | $3,186 | 563 | - | - | $265 | - | $19,499 580,146 kWh |
$20,300 1,448 kW-months/year |
$3,186 563 MMBtu |
- - lb |
$265 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost |