IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 2836 Biological Products Exc. Diagnostic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0037 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,697 $2,500 Implemented
IA0037 # 03 Y:1992 03 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,475 $2,628 Not Implemented
IA0037 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,383 $600 Not Implemented
IA0037 # 05 Y:1992 05 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,117 $600 Not Implemented
IA0037 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,046 $3,050 Implemented
KU0273 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,620 $38,400 Implemented
KU0273 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,343 $1,400 Implemented
KU0273 # 03 Y:1989 03 1989 INSTALL TURBULATORS $5,599 $5,760 Implemented
KU0273 # 04 Y:1989 04 1989 KEEP BOILER TUBES CLEAN $3,005 $1,500 Implemented
KU0273 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,859 $2,558 Implemented
KU0266 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $282 Implemented
KU0266 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,274 $1,008 Implemented
KU0266 # 03 Y:1988 03 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,166 $7,300 Not Implemented
KU0266 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $100 Implemented
KU0266 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $791 $860 Implemented
KU0266 # 06 Y:1988 06 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,336 $1,300 Not Implemented
KU0266 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $898 $1,500 Implemented
KU0266 # 08 Y:1988 08 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $406 $580 Not Implemented
KU0266 # 09 Y:1988 09 1988 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $396 $580 Implemented
KU0175 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,551 $484 Implemented
KU0175 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $2,503 Implemented
KU0175 # 03 Y:1985 03 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $875 $22 Implemented
KU0175 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $576 $0 Implemented
KU0175 # 05 Y:1985 05 1985 INSTALL AUTOMATIC STACK DAMPER $414 $1,300 Not Implemented
KU0175 # 06 Y:1985 06 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $337 $0 Implemented