IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2841 Soap And Other Detergents
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0279 # 07 Y:2019 07 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $19,835 $25,600 Implemented
MZ0279 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $428 $1,464 Implemented
MZ0279 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $16,719 $14,400 Implemented
MZ0279 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,794 $6,252 Implemented
MZ0279 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,014 $640 Implemented
MZ0279 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,031 $4,700 Implemented
MO0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,876 $566 Implemented
MO0259 # 07 Y:1999 07 1999 $13,260 $1,732 Implemented
MO0259 # 05 Y:1999 05 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $48 $80 Implemented
MO0259 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,994 $4,410 Implemented
MO0259 # 01 Y:1999 01 1999 REPLACE BOILER $16,318 $2,000 Implemented
MO0029 # 01 Y:1991 01 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,050 $75 Implemented
MO0029 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $96 $0 Implemented
MO0029 # 08 Y:1991 08 1991 INSULATE BARE EQUIPMENT $879 $213 Implemented
MO0029 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $175 Implemented
MO0029 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $115 Implemented
MO0029 # 05 Y:1991 05 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,055 $704 Implemented
MO0029 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,536 $960 Implemented
MO0029 # 03 Y:1991 03 1991 RECOVER WASTE HEAT FROM EQUIPMENT $5,103 $1,218 Implemented
MO0029 # 02 Y:1991 02 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,195 $0 Implemented