Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2841 | Soap And Other Detergents |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0273 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,056 | $26,912 | Not Implemented |
MS0273 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,069 | $12,540 | Not Implemented |
MS0273 # 12 Y:2005 | 12 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $261 | $204 | Implemented |
MS0273 # 11 Y:2005 | 11 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $891 | $240 | Not Implemented |
MS0273 # 10 Y:2005 | 10 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,338 | $1,215 | Not Implemented |
MS0273 # 09 Y:2005 | 09 | 2005 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,353 | $231 | Not Implemented |
MS0273 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,474 | $203 | Not Implemented |
MS0273 # 07 Y:2005 | 07 | 2005 | PAY UTILITY BILLS ON TIME | $3,704 | $0 | Implemented |
MS0273 # 06 Y:2005 | 06 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,219 | $1,480 | Not Implemented |
MS0273 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,326 | $19,601 | Not Implemented |
MS0273 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,737 | $685 | Not Implemented |
MS0273 # 03 Y:2005 | 03 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $7,498 | $89 | Implemented |
TN0587 # 14 Y:1996 | 14 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $627 | $186 | Implemented |
TN0587 # 13 Y:1996 | 13 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $700 | $0 | Not Implemented |
TN0587 # 12 Y:1996 | 12 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $644 | $1,330 | Not Implemented |
TN0587 # 11 Y:1996 | 11 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $946 | $1,000 | Implemented |
TN0587 # 10 Y:1996 | 10 | 1996 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $970 | $0 | Implemented |
TN0587 # 09 Y:1996 | 09 | 1996 | METER WASTE WATER | $1,600 | $0 | Not Implemented |
TN0587 # 08 Y:1996 | 08 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,134 | $5,670 | Not Implemented |
TN0587 # 07 Y:1996 | 07 | 1996 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,575 | $0 | Not Implemented |
TN0587 # 06 Y:1996 | 06 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,620 | $8,300 | Not Implemented |
TN0587 # 05 Y:1996 | 05 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,600 | $2,780 | Not Implemented |
TN0587 # 04 Y:1996 | 04 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,442 | $0 | Implemented |
TN0587 # 03 Y:1996 | 03 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $10,400 | $8,640 | Not Implemented |
TN0587 # 02 Y:1996 | 02 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $12,250 | $10,450 | Implemented |