IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
SIC 2842 Polishes And Sanitation Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0307 # 06 Y:1994 06 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $340 $980 Not Implemented
AM0208 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $13,375 $16,000 Implemented
AM0208 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $6,550 $2,135 Implemented
AM0208 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,265 $5,320 Implemented
AM0208 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,570 $5,850 Implemented
AM0208 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $815 $1,535 Implemented
WI0173 # 01 Y:1993 01 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,690 $400 Implemented
WI0173 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69 $0 Not Implemented
WI0173 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,943 $0 Implemented
WI0173 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $682 $1,181 Implemented
WI0173 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $426 $1,200 Not Implemented
WI0173 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $500 Not Implemented
WI0173 # 07 Y:1993 07 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $959 $1,085 Not Implemented
WI0173 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $640 Not Implemented
WI0173 # 09 Y:1993 09 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $246 $0 Implemented
WI0173 # 10 Y:1993 10 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25 $0 Implemented
KU0392 # 01 Y:1993 01 1993 INSTALL TIMERS AND/OR THERMOSTATS $10,912 $1,720 Not Implemented
KU0392 # 02 Y:1993 02 1993 RECOVER AND REUSE COOLING WATER $7,703 $6,000 Not Implemented
KU0392 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $5,749 $6,500 Not Implemented
KU0392 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $0 Not Implemented
KU0392 # 05 Y:1993 05 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,137 $2,500 Not Implemented
KU0392 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,914 $300 Not Implemented
KU0392 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $701 $150 Not Implemented
IA0046 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $50 Implemented
IA0046 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,060 $150 Implemented