IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2842 Polishes And Sanitation Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0361 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $649 $0 Not Implemented
WI0361 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $894 $0 Not Implemented
WI0361 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $984 $3,740 Implemented
WI0361 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,555 $1,380 Not Implemented
WI0361 # 02 Y:2000 02 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,677 $45,000 Not Implemented
WI0361 # 01 Y:2000 01 2000 $25,500 $0 Not Implemented
WI0303 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,381 $15,000 Not Implemented
WI0303 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $696 $0 Not Implemented
WI0303 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,329 $840 Not Implemented
WI0303 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,961 $500 Not Implemented
WI0303 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,215 $3,484 Not Implemented
WI0173 # 01 Y:1993 01 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,690 $400 Implemented
WI0173 # 10 Y:1993 10 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25 $0 Implemented
WI0173 # 09 Y:1993 09 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $246 $0 Implemented
WI0173 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $640 Not Implemented
WI0173 # 07 Y:1993 07 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $959 $1,085 Not Implemented
WI0173 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $500 Not Implemented
WI0173 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $426 $1,200 Not Implemented
WI0173 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $682 $1,181 Implemented
WI0173 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,943 $0 Implemented
WI0173 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69 $0 Not Implemented