IAC Assessment: WI0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Automotive Fluids
NAICS n/a
SIC 2842 - Polishes And Sanitation Goods
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 210,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,502 4,457,796 kWh $0.04
Electricity Demand $125,455 10,242 kW-months/year $12.25
Electricity Fees $43,980 - $ -
Natural Gas $44,097 16,046 MMBtu $2.75
TOTAL ENERGY COSTS $443,830
RECOMMENDED SAVINGS* $46,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $984
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$25,500
Cost:
-
- - - - - - $25,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$25,500
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$14,677
Cost:
$45,000
$11,145 254,982 $3,532 273 - - - - $11,145
254,982
kWh
$3,532
273
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,555
Cost:
$1,380
$2,578 58,910 $977 76 - - - - $2,578
58,910
kWh
$977
76
kW-months/year
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$984
Cost:
$3,740
$605 13,775 $379 29 - - - - $605
13,775
kWh
$379
29
kW-months/year
-
-
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$894
Cost:
-
- - - - $894 - - - -
-
kWh
-
-
kW-months/year
$894
-
lb
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$649
Cost:
-
$493 11,137 $156 12 - - - - $493
11,137
kWh
$156
12
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$46,259
Cost:
$50,120
$14,821 338,804 $5,044 390 $894 - $25,500 - $14,821
338,804
kWh
$5,044
390
kW-months/year
$894
-
lb
$25,500
-
$
TOTAL IMPLEMENTED Savings:
$984
Cost:
$3,740
$605 13,775 $379 29 - - - - $605
13,775
kWh
$379
29
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes