IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 2844 Toilet Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0328 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,307 $13,190 Implemented
MI0328 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,680 $40 Implemented
MI0328 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,135 $1,660 Implemented
MI0328 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,847 $63,840 Implemented
MI0234 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,035 $2,600 Implemented
MI0234 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,388 $80 Implemented
MI0234 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,377 $1,660 Implemented
MI0234 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,115 $8,409 Implemented
MI0234 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,067 $2,520 Implemented
MI0234 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,103 $80 Implemented
MI0234 # 08 Y:2013 08 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $252 $447 Implemented
UF0370 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,736 $1,212 Implemented
UF0370 # 03 Y:2005 03 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $20,435 $56,000 Implemented
UF0370 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $4,053 $1,317 Implemented
UF0370 # 09 Y:2005 09 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,299 $130,000 Implemented
UF0370 # 11 Y:2005 11 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,313 $0 Implemented
MI0076 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,535 $1,370 Implemented
MI0076 # 04 Y:2004 04 2004 $3,936 $6,000 Implemented
MI0076 # 06 Y:2004 06 2004 $45,000 $23,400 Implemented
MI0049 # 06 Y:2002 06 2002 $3,658 $3,000 Implemented
MI0049 # 01 Y:2002 01 2002 $1,206,000 $100 Implemented
UF0128 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,931 $4,920 Implemented
UF0128 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $350 Implemented
UF0128 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,168 $750 Implemented