IAC logo
IAC Assessment: UF0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Sun care products
NAICS n/a
SIC 2844 - Toilet Preparations
Sales $50,000,000-$100,000,000
# of Employees 275
Plant Area (Sq.Ft.) 190,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 5,600
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,997 4,107,269 kWh $0.07
LPG $22,973 2,959 MMBtu $7.76
TOTAL ENERGY COSTS $309,010
RECOMMENDED SAVINGS* $91,346 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,229
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Administrative Changes Electricity Usage Other Liquid (haz) Administrative Changes
$ kWh $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$836
Cost:
$646
$836 11,723 - - - - $836
11,723
kWh
-
-
gal
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,168
Cost:
$750
$8,168 106,389 - - - - $8,168
106,389
kWh
-
-
gal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,643
Cost:
$768
$2,643 61,547 - - - - $2,643
61,547
kWh
-
-
gal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,130
Cost:
$350
$4,130 62,720 - - - - $4,130
62,720
kWh
-
-
gal
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,931
Cost:
$4,920
$2,931 41,911 - - - - $2,931
41,911
kWh
-
-
gal
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,330
Cost:
$12,000
$3,330 57,444 - - - - $3,330
57,444
kWh
-
-
gal
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$59,898
Cost:
$100,000
- - - - $59,898 - -
-
kWh
-
-
gal
$59,898
-
$
08: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$5,730
Cost:
$7,000
- - - - $5,730 - -
-
kWh
-
-
gal
$5,730
-
$
09: 3.8137 USE SOY OR WATER-BASED INKS Savings:
$3,680
Cost:
-
- - $3,680 120 - - -
-
kWh
$3,680
120
gal
-
-
$
TOTAL RECOMMENDED Savings:
$91,346
Cost:
$126,434
$22,038 341,734 $3,680 120 $65,628 - $22,038
341,734
kWh
$3,680
120
gal
$65,628
-
$
TOTAL IMPLEMENTED Savings:
$15,229
Cost:
$6,020
$15,229 211,020 - - - - $15,229
211,020
kWh
-
-
gal
-
-
$
Savings
Cost
$ kWh $ gal $ $
Electricity Usage Other Liquid (haz) Administrative Changes Electricity Usage Other Liquid (haz) Administrative Changes