IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

488

matching recommendations
Reset
SIC 2844 Toilet Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0157 # 06 Y:1993 06 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $880 $125 Implemented
ND0157 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $427 $2,355 Not Implemented
TN0447 # 01 Y:1992 01 1992 INSTALL SET-BACK TIMERS $9,430 $11,500 Not Implemented
TN0447 # 02 Y:1992 02 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,740 $6,200 Not Implemented
TN0447 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,224 $8,200 Not Implemented
TN0447 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $919 $350 Not Implemented
CO0218 # 01 Y:1991 01 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,390 $250 Implemented
CO0218 # 02 Y:1991 02 1991 RECOVER AND REUSE COOLING WATER $3,482 $0 Implemented
CO0218 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $684 $873 Implemented
CO0218 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $380 Implemented
CO0218 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $275 $1,200 Implemented
CO0218 # 06 Y:1991 06 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $911 $1,000 Implemented
CO0218 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $212 $326 Implemented
CO0218 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $400 Implemented
AS0021 # 01 Y:1991 01 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,378 $0 Implemented
AS0021 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,782 $18,179 Implemented
AS0021 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,879 $0 Implemented
AS0021 # 04 Y:1991 04 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,913 $35,000 Implemented
AS0021 # 05 Y:1991 05 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $90,586 $400,000 Implemented
AS0021 # 06 Y:1991 06 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,386 $18,000 Implemented
AS0021 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,885 $1,000 Implemented
AS0021 # 08 Y:1991 08 1991 RECOVER WASTE HEAT FROM EQUIPMENT $12,180 $1,760 Implemented
AS0021 # 09 Y:1991 09 1991 IMPROVE LUBRICATION PRACTICES $7,796 $0 Implemented
AS0021 # 10 Y:1991 10 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,246 $18,000 Implemented
AS0021 # 11 Y:1991 11 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $101,612 $1,050,000 Implemented