Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
488
matching recommendationsSIC | 2844 | Toilet Preparations |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0157 # 06 Y:1993 | 06 | 1993 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $880 | $125 | Implemented |
ND0157 # 07 Y:1993 | 07 | 1993 | INSULATE BARE EQUIPMENT | $427 | $2,355 | Not Implemented |
TN0447 # 01 Y:1992 | 01 | 1992 | INSTALL SET-BACK TIMERS | $9,430 | $11,500 | Not Implemented |
TN0447 # 02 Y:1992 | 02 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,740 | $6,200 | Not Implemented |
TN0447 # 03 Y:1992 | 03 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,224 | $8,200 | Not Implemented |
TN0447 # 04 Y:1992 | 04 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $919 | $350 | Not Implemented |
CO0218 # 01 Y:1991 | 01 | 1991 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,390 | $250 | Implemented |
CO0218 # 02 Y:1991 | 02 | 1991 | RECOVER AND REUSE COOLING WATER | $3,482 | $0 | Implemented |
CO0218 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $684 | $873 | Implemented |
CO0218 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $230 | $380 | Implemented |
CO0218 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $275 | $1,200 | Implemented |
CO0218 # 06 Y:1991 | 06 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $911 | $1,000 | Implemented |
CO0218 # 07 Y:1991 | 07 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $212 | $326 | Implemented |
CO0218 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $250 | $400 | Implemented |
AS0021 # 01 Y:1991 | 01 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,378 | $0 | Implemented |
AS0021 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,782 | $18,179 | Implemented |
AS0021 # 03 Y:1991 | 03 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,879 | $0 | Implemented |
AS0021 # 04 Y:1991 | 04 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,913 | $35,000 | Implemented |
AS0021 # 05 Y:1991 | 05 | 1991 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $90,586 | $400,000 | Implemented |
AS0021 # 06 Y:1991 | 06 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $17,386 | $18,000 | Implemented |
AS0021 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,885 | $1,000 | Implemented |
AS0021 # 08 Y:1991 | 08 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,180 | $1,760 | Implemented |
AS0021 # 09 Y:1991 | 09 | 1991 | IMPROVE LUBRICATION PRACTICES | $7,796 | $0 | Implemented |
AS0021 # 10 Y:1991 | 10 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,246 | $18,000 | Implemented |
AS0021 # 11 Y:1991 | 11 | 1991 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $101,612 | $1,050,000 | Implemented |