IAC logo
IAC Assessment: HO0092
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0092
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1994
Principal Product Active Ingredients for Sun Screens
NAICS n/a
SIC 2844 - Toilet Preparations
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 48,000
Annual Production 11,700,000 Pounds
Production Hrs. Annual 8,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,414 2,429,074 kWh $0.09
Natural Gas $156,912 44,974 MMBtu $3.49
TOTAL ENERGY COSTS $384,326
RECOMMENDED SAVINGS* $100,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,365
Cost:
$3,213
$4,365 46,600 - - - - $4,365
46,600
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,037
Cost:
$3,950
$2,037 21,688 - - - - $2,037
21,688
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$907
Cost:
$952
$907 9,672 - - - - $907
9,672
kWh
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$640
Cost:
$155
- - $640 183 - - -
-
kWh
$640
183
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$92,908
Cost:
$462,000
$195,730 2,090,563 $(-56,814) (-16,279) $(-46,008) - $195,730
2,090,563
kWh
$(-56,814)
(-16,279)
MMBtu
$(-46,008)
-
$
TOTAL RECOMMENDED Savings:
$100,857
Cost:
$470,270
$203,039 2,168,523 $(-56,174) (-16,096) $(-46,008) - $203,039
2,168,523
kWh
$(-56,174)
(-16,096)
MMBtu
$(-46,008)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes