IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

741

matching recommendations
Reset
SIC 285 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0312 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $9,752 $8,000 Implemented
MI0312 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,631 $5,377 Not Implemented
MI0312 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,544 $19,300 Implemented
MI0312 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,938 $960 Implemented
MI0312 # 09 Y:2017 09 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,535 $580 Not Implemented
DL0170 # 04 Y:2016 04 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $8,780 $47,412 Not Implemented
DL0170 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,950 $9,830 Not Implemented
DL0170 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,055 $40,740 Not Implemented
DL0170 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $12,960 $23,000 Not Implemented
UD0898 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $50 Implemented
UD0898 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,196 $300 Not Implemented
UD0898 # 03 Y:2014 03 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $778 $0 Not Implemented
UD0898 # 04 Y:2014 04 2014 COVER OPEN TANKS $57 $200 Implemented
UD0898 # 05 Y:2014 05 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $8,127 $6,567 Not Implemented
UD0898 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,748 $2,320 Not Implemented
UD0898 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $621 $20 Implemented
UD0898 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $309 $0 Implemented
SU0353 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $839 $0 Implemented
SU0353 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $6,044 $1,188 Not Implemented
SU0353 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $896 $273 Implemented
SU0353 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $345 Implemented
SU0353 # 05 Y:2013 05 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,685 $3,075 Implemented
SU0353 # 06 Y:2013 06 2013 REPLACE BOILER $34,391 $40,935 Implemented
SU0353 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18 $29 Implemented
SU0353 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $627 $737 Implemented