Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
745
matching recommendationsSIC | 2851 | Paints And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0596 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,400 | $37,895 | Implemented |
MA0596 # 06 Y:2006 | 06 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,195 | $13,000 | Implemented |
MA0596 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $4,855 | $8,000 | Implemented |
MA0596 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,870 | $18,200 | Not Implemented |
MA0596 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,026 | $5,350 | Implemented |
MA0596 # 10 Y:2006 | 10 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,415 | $9,840 | Implemented |
MA0596 # 11 Y:2006 | 11 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $458 | $0 | Not Implemented |
MA0596 # 12 Y:2006 | 12 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $360 | $900 | Not Implemented |
AM0496 # 01 Y:2005 | 01 | 2005 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $35,000 | $102,400 | Not Implemented |
AM0496 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $6,400 | $8,050 | Implemented |
AM0496 # 03 Y:2005 | 03 | 2005 | PAY UTILITY BILLS ON TIME | $1,448 | $0 | Implemented |
AM0496 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,400 | $5 | Implemented |
AM0496 # 05 Y:2005 | 05 | 2005 | USE SYNTHETIC LUBRICANT | $853 | $0 | Not Implemented |
AM0496 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $110 | $0 | Implemented |
OK0709 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $2,560 | $0 | Not Implemented |
OK0709 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $3,684 | $1,030 | Implemented |
OK0709 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,659 | $11,363 | Not Implemented |
OK0709 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,493 | $21,700 | Not Implemented |
OK0709 # 05 Y:2005 | 05 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000 | $0 | Not Implemented |
OK0709 # 06 Y:2005 | 06 | 2005 | INSTALL SET-BACK TIMERS | $4,055 | $2,205 | Not Implemented |
OK0709 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,077 | $4,640 | Not Implemented |
OK0709 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $541 | $3,034 | Not Implemented |
OK0709 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $824 | $1,820 | Not Implemented |
OK0709 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127 | $109 | Not Implemented |
OK0709 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $159 | $1,000 | Not Implemented |