IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2851 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0294 # 02 Y:2010 02 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,939 $3,600 Not Implemented
LE0294 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,696 $12,000 Not Implemented
LE0294 # 04 Y:2010 04 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,495 $3,000 Implemented
LE0294 # 05 Y:2010 05 2010 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,844 $6,000 Not Implemented
LE0294 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,824 Implemented
LE0294 # 07 Y:2010 07 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,376 $2,550 Not Implemented
LE0294 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,483 $800 Not Implemented
LE0294 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $575 $40 Not Implemented
LE0294 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $62,047 $3,000 Not Implemented
WV0100 # 11 Y:1996 11 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,120 $100 Not Implemented
WV0100 # 10 Y:1996 10 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,840 $150 Implemented
WV0100 # 09 Y:1996 09 1996 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,236 $3,000 Not Implemented
WV0100 # 08 Y:1996 08 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,070 $1,900 Implemented
WV0100 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $545 $656 Not Implemented
WV0100 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $1,680 $2,290 Implemented
WV0100 # 05 Y:1996 05 1996 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,817 $0 Not Implemented
WV0100 # 04 Y:1996 04 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $753 $4,725 Not Implemented
WV0100 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $207 $30 Implemented
WV0100 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $256 $573 Implemented
WV0100 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $261 Implemented