IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 286 Industrial Organic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0226 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $14,515 $800 Implemented
LE0226 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,061 $47,500 Implemented
LE0226 # 04 Y:2006 04 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $64,647 $2,500 Not Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented
LE0226 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,146 $363,000 Not Implemented
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 07 Y:2006 07 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,946 $16,000 Not Implemented
LE0226 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $500 Implemented
RU0132 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $952 $0 Not Implemented
RU0132 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,283 $0 Not Implemented
RU0132 # 03 Y:1991 03 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,363 $5,000 Not Implemented
RU0132 # 04 Y:1991 04 1991 IMPROVE LUBRICATION PRACTICES $3,958 $0 Not Implemented
RU0132 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $1,780 $194 Not Implemented
RU0132 # 06 Y:1991 06 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $18,844 $200 Not Implemented
RU0132 # 07 Y:1991 07 1991 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $26,390 $0 Not Implemented
RU0013 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,641 $10,500 Implemented
RU0013 # 04 Y:1987 04 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,166 $200 Not Implemented
RU0013 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $3,814 $1,600 Implemented
RU0013 # 01 Y:1987 01 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,343 $1,050 Implemented
ST0059 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,411 $537 Implemented
ST0059 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $997 Implemented
ST0059 # 02 Y:1986 02 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $848 $310 Implemented
ST0059 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,706 $12,500 Not Implemented
ST0059 # 05 Y:1986 05 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,301 $6,000 Implemented
ST0059 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $234 $633 Not Implemented