Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
774
matching recommendationsSIC | 2869 | Industrial Organic Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2419 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $149 | $390 | n/a |
UC2419 # 02 Y:2024 | 02 | 2024 | PAY UTILITY BILLS ON TIME | $178 | $0 | n/a |
UC2419 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,471 | $776,252 | n/a |
UC2419 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $436 | $75 | n/a |
UC2419 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,548 | $10,295 | n/a |
UC2419 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,596 | $0 | n/a |
UC2419 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,510 | $2,929 | n/a |
UC2419 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $22,646 | $4,752 | n/a |
UC2419 # 05 Y:2024 | 05 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,234 | $1,183 | n/a |
IC0313 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,223 | $100,000 | n/a |
IC0313 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $6,524 | $27,807 | n/a |
IC0313 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,979 | $2,430 | n/a |
IC0313 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $4,631 | $8,869 | n/a |
IC0313 # 09 Y:2024 | 09 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $19,590 | $704 | n/a |
IC0313 # 01 Y:2024 | 01 | 2024 | OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS | $9,651 | $7,079 | n/a |
IC0313 # 08 Y:2024 | 08 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $75,451 | $92,231 | n/a |
IC0313 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,211 | $220,985 | n/a |
IC0313 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,562 | $0 | n/a |
IC0313 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,107 | $6,125 | n/a |
IC0313 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,557 | $0 | n/a |
CC0039 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,082 | $7,780 | n/a |
CC0039 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,467 | $0 | n/a |
CC0039 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,466 | $68,475 | n/a |
CC0039 # 06 Y:2024 | 06 | 2024 | REDUCE EXCESS STEAM BLEEDING | $11,803 | $0 | n/a |
CC0039 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,248 | $226,305 | n/a |