Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Citrus Flavor and Fragrance Ingredients
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 103,000
Annual Production 7,500 Tons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,812 3,755,009 kWh $0.04
Electricity Demand $149,563 8,576 kW-months/year $17.44
Electricity Fees $54,783 - $ -
Natural Gas $210,000 19,000 MMBtu $11.05
LPG $9,560 218 MMBtu $43.77
TOTAL ENERGY COSTS $623,154
RECOMMENDED SAVINGS* $131,544 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$43,631
Cost:
$322,608
$26,889 625,327 $16,742 960 - - $26,889
625,327
kWh
$16,742
960
kW-months/year
-
-
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$21,772
Cost:
$20,202
$11,302 262,851 $10,470 600 - - $11,302
262,851
kWh
$10,470
600
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,911
Cost:
$34,076
$16,911 393,271 - - - - $16,911
393,271
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,726
Cost:
$12,000
- - - - $12,726 1,151 -
-
kWh
-
-
kW-months/year
$12,726
1,151
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,526
Cost:
$20,560
$5,526 128,501 - - - - $5,526
128,501
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$4,200
Cost:
$2,000
- - - - $4,200 380 -
-
kWh
-
-
kW-months/year
$4,200
380
MMBtu
07: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$4,170
Cost:
$6,785
$4,170 96,980 - - - - $4,170
96,980
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,170
Cost:
$2,654
$4,170 97,980 - - - - $4,170
97,980
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.1222 INSTALL TURBULATORS Savings:
$2,277
Cost:
$3,750
- - - - $2,277 206 -
-
kWh
-
-
kW-months/year
$2,277
206
MMBtu
10: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK Savings:
$2,684
Cost:
$2,743
- - - - $2,684 243 -
-
kWh
-
-
kW-months/year
$2,684
243
MMBtu
11: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL Savings:
$3,839
Cost:
$3,079
- - - - $3,839 347 -
-
kWh
-
-
kW-months/year
$3,839
347
MMBtu
12: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$7,429
Cost:
$20,000
$3,229 75,100 - - $4,200 380 $3,229
75,100
kWh
-
-
kW-months/year
$4,200
380
MMBtu
13: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$1,094
Cost:
-
$663 15,432 - - $431 39 $663
15,432
kWh
-
-
kW-months/year
$431
39
MMBtu
14: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$1,115
Cost:
$3,888
$1,115 25,920 - - - - $1,115
25,920
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$131,544
Cost:
$454,345
$73,975 1,721,362 $27,212 1,560 $30,357 2,747 $73,975
1,721,362
kWh
$27,212
1,560
kW-months/year
$30,357
2,747
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas