IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0099 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $162 $150 Implemented
NC0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $2,928 Not Implemented
NC0011 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $21,960 Not Implemented
NC0011 # 03 Y:1993 03 1993 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $7,188 $1,760 Implemented
NC0011 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $1,200 Implemented
NC0011 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,033 $510 Implemented
NC0011 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $300 Implemented
UD0408 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,008 $1,500 Implemented
UD0408 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,052 $21,676 Implemented
UD0408 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $0 Implemented
UD0408 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,391 $10,000 Implemented
UD0408 # 05 Y:1993 05 1993 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $3,000 Implemented
UD0408 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,779 $4,000 Not Implemented
UD0407 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,303 $6,000 Implemented
UD0407 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,300 $1,000 Implemented
UD0407 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,563 $500 Implemented
UD0407 # 04 Y:1993 04 1993 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,346 $1,500 Implemented
AM0167 # 01 Y:1993 01 1993 SHUT OFF PILOTS IN STANDBY EQUIPMENT $28,100 $0 Implemented
AM0167 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $10,100 $16,000 Implemented
AM0167 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,720 $4,400 Implemented
AM0167 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,610 $4,900 Implemented
AM0167 # 05 Y:1993 05 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,970 $2,450 Not Implemented
AM0167 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,290 $0 Not Implemented
AM0147 # 01 Y:1992 01 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,460 $9,780 Implemented
AM0147 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $9,110 $2,000 Implemented