IAC logo
IAC Assessment: UF0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1994
Principal Product Oil & water-based products
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,700
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,096 1,123,681 kWh $0.07
Natural Gas $83,333 20,867 MMBtu $3.99
TOTAL ENERGY COSTS $165,429
RECOMMENDED SAVINGS* $17,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,286
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,528
Cost:
$706
$1,528 20,809 - - $1,528
20,809
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$467
Cost:
$1,456
$467 6,155 - - $467
6,155
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$238
Cost:
$320
$238 2,638 - - $238
2,638
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,591
Cost:
$4,728
$3,591 47,773 - - $3,591
47,773
kWh
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,906
Cost:
$5,200
- - $1,906 477 -
-
kWh
$1,906
477
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,509
Cost:
$22,500
$6,509 125,147 - - $6,509
125,147
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$102
Cost:
$128
$102 2,052 - - $102
2,052
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,700
Cost:
$2,700
- - $2,700 625 -
-
kWh
$2,700
625
MMBtu
TOTAL RECOMMENDED Savings:
$17,041
Cost:
$37,738
$12,435 204,574 $4,606 1,102 $12,435
204,574
kWh
$4,606
1,102
MMBtu
TOTAL IMPLEMENTED Savings:
$8,286
Cost:
$9,590
$5,586 74,737 $2,700 625 $5,586
74,737
kWh
$2,700
625
MMBtu