IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0167 # 05 Y:1993 05 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,970 $2,450 Not Implemented
AM0167 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,290 $0 Not Implemented
AM0147 # 01 Y:1992 01 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,460 $9,780 Implemented
AM0147 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $9,110 $2,000 Implemented
AM0147 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,600 $540 Implemented
AM0147 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $3,830 $90 Implemented
AM0147 # 05 Y:1992 05 1992 IMPROVE LUBRICATION PRACTICES $2,430 $0 Not Implemented
AM0147 # 06 Y:1992 06 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $1,020 $870 Not Implemented
AM0147 # 07 Y:1992 07 1992 INSTALL SET-BACK TIMERS $870 $1,580 Implemented
AM0147 # 08 Y:1992 08 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $125 Implemented
UD0344 # 01 Y:1991 01 1991 RECOVER WASTE HEAT FROM EQUIPMENT $16,902 $5,000 Implemented
UD0344 # 02 Y:1991 02 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $20,762 $0 Implemented
UD0344 # 03 Y:1991 03 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,492 $0 Implemented
UD0344 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,529 $0 Implemented
RU0071 # 01 Y:1989 01 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,813 $0 Not Implemented
RU0071 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $295 Implemented
RU0071 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $0 Not Implemented
RU0071 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $117 Not Implemented
RU0071 # 05 Y:1989 05 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,352 $50 Implemented
RU0071 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,906 $6,800 Not Implemented
RU0071 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,674 $2,700 Not Implemented
RU0071 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,772 $500 Implemented
KU0284 # 01 Y:1989 01 1989 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $831,745 $1,230,000 Implemented
KU0284 # 02 Y:1989 02 1989 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $139,391 $226,000 Implemented
KU0284 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $16,143 $5,856 Implemented