IAC logo
IAC Assessment: MO0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1993
Principal Product Specialty Chemicals for Electronics
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 19,000
Annual Production 2 Thousand Gallons
Production Hrs. Annual 3,120
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,682 1,215,123 kWh $0.05
LPG $9,290 1,437 MMBtu $6.46
TOTAL ENERGY COSTS $72,972
RECOMMENDED SAVINGS* $17,257 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,255
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$12,072
Cost:
$11,325
$2,717 32,239 $9,355 1,448 - - $2,717
32,239
kWh
$9,355
1,448
MMBtu
-
-
$
02: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$760
Cost:
$150
$760 14,654 - - - - $760
14,654
kWh
-
-
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$684
Cost:
$578
$154 2,931 $530 82 - - $154
2,931
kWh
$530
82
MMBtu
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$597
Cost:
$1,629
$134 2,638 $463 72 - - $134
2,638
kWh
$463
72
MMBtu
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$333
Cost:
$200
- - - - $333 - -
-
kWh
-
-
MMBtu
$333
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,419
Cost:
$10,452
$1,419 27,257 - - - - $1,419
27,257
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$740
Cost:
$466
$740 14,068 - - - - $740
14,068
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$490
Cost:
$1,207
$490 9,379 - - - - $490
9,379
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$162
Cost:
$150
$162 3,224 - - - - $162
3,224
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,257
Cost:
$26,157
$6,576 106,390 $10,348 1,602 $333 - $6,576
106,390
kWh
$10,348
1,602
MMBtu
$333
-
$
TOTAL IMPLEMENTED Savings:
$4,255
Cost:
$13,003
$3,725 71,513 $530 82 - - $3,725
71,513
kWh
$530
82
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes