IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0056 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,169 $770 Implemented
NL0056 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $11,549 Implemented
NL0056 # 03 Y:2021 03 2021 REPAIR AND ELIMINATE STEAM LEAKS $8,331 $4,500 Not Implemented
NL0056 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,032 $1,600 Implemented
NL0056 # 01 Y:2021 01 2021 OPERATE DISTILLATION COLUMNS EFFICIENTLY $222,300 $82,500 Implemented
NL0031 # 02 Y:2019 02 2019 INSTALL TURBULATORS $66,132 $93,000 Implemented
NL0031 # 05 Y:2019 05 2019 REPAIR AND ELIMINATE STEAM LEAKS $5,225 $1,600 Not Implemented
NL0031 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,390 $24,394 Implemented
NL0031 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,344 $46,600 Implemented
NL0031 # 01 Y:2019 01 2019 USE OPTIMUM TEMPERATURE $1,023,132 $178,000 Implemented
KU0284 # 01 Y:1989 01 1989 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $831,745 $1,230,000 Implemented
KU0284 # 08 Y:1989 08 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $169 $0 Implemented
KU0284 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $931 $1,018 Implemented
KU0284 # 06 Y:1989 06 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $618 $0 Implemented
KU0284 # 05 Y:1989 05 1989 IMPROVE LUBRICATION PRACTICES $2,169 $0 Implemented
KU0284 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,092 $3,080 Implemented
KU0284 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $16,143 $5,856 Implemented
KU0284 # 02 Y:1989 02 1989 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $139,391 $226,000 Implemented