IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0102 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,470 $3,472 Not Implemented
HO0102 # 03 Y:1995 03 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $177,106 $600,000 Not Implemented
HO0102 # 04 Y:1995 04 1995 KEEP BOILER TUBES CLEAN $12,545 $1,000 Implemented
HO0102 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $241 $100 Not Implemented
HO0102 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $924 $200 Implemented
RU0071 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,906 $6,800 Not Implemented
RU0071 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,772 $500 Implemented
RU0071 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,674 $2,700 Not Implemented
RU0071 # 05 Y:1989 05 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,352 $50 Implemented
RU0071 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $117 Not Implemented
RU0071 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $0 Not Implemented
RU0071 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $295 Implemented
RU0071 # 01 Y:1989 01 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,813 $0 Not Implemented
ST0075 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,355 $0 Implemented
ST0075 # 02 Y:1986 02 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $130 $400 Implemented
ST0075 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,137 $537 Implemented
ST0075 # 04 Y:1986 04 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $78,667 $20,000 Not Implemented
ST0075 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,765 $3,667 Not Implemented
ST0075 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,976 $600 Not Implemented
ST0075 # 07 Y:1986 07 1986 REPAIR OR REPLACE STEAM TRAPS $6,449 $500 Implemented
ST0075 # 08 Y:1986 08 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,136 $507 Implemented