IAC Assessment: ST0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1986
Principal Product CHEMICAL IMTERMEDIATES
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,353 2,638,335 kWh $0.06
Natural Gas $1,471 285 MMBtu $5.16
Fuel Oil #2 $471,280 77,623 MMBtu $6.07
TOTAL ENERGY COSTS $626,104
RECOMMENDED SAVINGS* $108,615 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,207
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,355
Cost:
-
$4,355 75,029 - - - - $4,355
75,029
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$130
Cost:
$400
$209 3,517 $(-79) (-15) - - $209
3,517
kWh
$(-79)
(-15)
MMBtu
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$14,137
Cost:
$537
- - - - $14,137 2,329 -
-
kWh
-
-
MMBtu
$14,137
2,329
MMBtu
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$78,667
Cost:
$20,000
- - - - $78,667 12,960 -
-
kWh
-
-
MMBtu
$78,667
12,960
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,765
Cost:
$3,667
$1,765 30,481 - - - - $1,765
30,481
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,976
Cost:
$600
- - - - $1,976 326 -
-
kWh
-
-
MMBtu
$1,976
326
MMBtu
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$6,449
Cost:
$500
- - - - $6,449 1,062 -
-
kWh
-
-
MMBtu
$6,449
1,062
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,136
Cost:
$507
$1,136 19,637 - - - - $1,136
19,637
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$108,615
Cost:
$26,211
$7,465 128,664 $(-79) (-15) $101,229 16,677 $7,465
128,664
kWh
$(-79)
(-15)
MMBtu
$101,229
16,677
MMBtu
TOTAL IMPLEMENTED Savings:
$26,207
Cost:
$1,944
$5,700 98,183 $(-79) (-15) $20,586 3,391 $5,700
98,183
kWh
$(-79)
(-15)
MMBtu
$20,586
3,391
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2