Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsSIC | 287 | Agricultural Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0317 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,952 | $236 | Implemented |
AS0430 # 02 Y:2006 | 02 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,545 | $7,500 | Implemented |
AS0430 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $3 | $1,077 | Implemented |
AS0430 # 04 Y:2006 | 04 | 2006 | INSTALL SKYLIGHTS | $782 | $4,400 | Implemented |
LM0095 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $93,378 | $1,200 | Implemented |
LM0095 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,900 | $2,262 | Implemented |
LM0095 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,871 | $750 | Implemented |
LM0095 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $749 | $100 | Implemented |
LM0095 # 08 Y:2005 | 08 | 2005 | MODIFY STARTUP/SHUTDOWN TIMES | $101,277 | $1,000 | Implemented |
LM0095 # 09 Y:2005 | 09 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $115,000 | $3,000 | Implemented |
LM0095 # 10 Y:2005 | 10 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $23,750 | $1,000 | Implemented |
LM0095 # 11 Y:2005 | 11 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $46,875 | $50,000 | Implemented |
SU0201 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,721 | $0 | Implemented |
SU0201 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,555 | $617 | Implemented |
SU0201 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $673 | $461 | Implemented |
SU0201 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,182 | $3,211 | Implemented |
UF0348 # 01 Y:2004 | 01 | 2004 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,333,121 | $2,700,000 | Implemented |
UF0348 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,420 | $29,400 | Implemented |
UF0348 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,249 | $0 | Implemented |
UF0348 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,169 | $10,500 | Implemented |
UF0348 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $39,206 | $74,000 | Implemented |
UF0348 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,203 | $6,441 | Implemented |
UF0348 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,977 | $456 | Implemented |
UF0348 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,760 | $0 | Implemented |
CO0546 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $974 | $2,964 | Implemented |