IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

258

matching recommendations
Reset
SIC 287 Agricultural Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2107 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $25 Implemented
LS2107 # 03 Y:2021 03 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $981 $250 Implemented
LS2107 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,148 $450 Implemented
LS2107 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $229 $326 Not Implemented
LS2107 # 05 Y:2021 05 2021 INSTALL AUTOMATIC PACKING EQUIPMENT $137,875 $144,000 Not Implemented
LS2107 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,971 $5,165 Implemented
AS0472 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,102 $53,286 Not Implemented
AS0472 # 04 Y:2019 04 2019 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $4,878 $6,000 Not Implemented
AS0472 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $20,091 $41,520 Not Implemented
AS0472 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $95,737 $8,636 Not Implemented
AS0472 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,692 $770 Implemented
AM0703 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,500 $195 Implemented
AM0703 # 05 Y:2016 05 2016 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,830 $1,000 Implemented
AM0703 # 02 Y:2016 02 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,300 $11,400 Implemented
AM0703 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $445 Implemented
AM0703 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,600 $52,500 Not Implemented
AM0703 # 03 Y:2016 03 2016 MOVE PRODUCT USING MECHANICAL MEANS $23,300 $66,600 Implemented
UD0911 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,256 $47,188 Implemented
UD0911 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,544 $0 Implemented
UD0911 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,866 $8,000 Not Implemented
UD0911 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,620 $1,000 Implemented
UD0911 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,693 $0 Not Implemented
UD0911 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $74,000 $124,534 Implemented
UD0911 # 05 Y:2014 05 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,978 $20,079 Implemented
UD0911 # 10 Y:2014 10 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $262,802 $80,000 Not Implemented