Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
145
matching recommendationsSIC | 2879 | Agricultural Chemicals, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0581 # 06 Y:2024 | 06 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $80 | $178 | n/a |
AS0581 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $161 | $322 | n/a |
AS0581 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $1,195 | $514 | n/a |
AS0581 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,885 | $8,703 | n/a |
AS0581 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $30,471 | $40,000 | n/a |
AS0581 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $114,491 | $1,279,371 | n/a |
TT0288 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $2,464 | $7,410 | Not Implemented |
TT0288 # 10 Y:2023 | 10 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $525 | $1,600 | Not Implemented |
TT0288 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,247 | $63,960 | Implemented |
TT0288 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,933 | $15,640 | Implemented |
TT0288 # 04 Y:2023 | 04 | 2023 | METER WASTE WATER | $15,491 | $1,100 | Not Implemented |
TT0288 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $17,505 | $0 | Not Implemented |
TT0288 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,257 | $14,220 | Not Implemented |
TT0288 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,036 | $28,000 | Implemented |
TT0288 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,975 | $63 | Not Implemented |
TT0288 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,111 | $3,350 | Implemented |
AM0838 # 05 Y:2022 | 05 | 2022 | USE SYNTHETIC LUBRICANT | $1,646 | $300 | Implemented |
AM0838 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,164 | $0 | Implemented |
AM0838 # 06 Y:2022 | 06 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,835 | $1,420 | Implemented |
AM0838 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,720 | $29,570 | Implemented |
AM0838 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,070 | $10,152 | Implemented |
AM0838 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,090 | $5,000 | Implemented |
AM0838 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $123,505 | $10,000 | Implemented |
LS2107 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $425 | $25 | Implemented |
LS2107 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,148 | $450 | Implemented |