Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,629
matching recommendationsSIC | 289 | Miscellaneous Chemical Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0065 # 14 Y:2025 | 14 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $533 | $191 | n/a |
WV0678 # 10 Y:2025 | 10 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,453 | $20,950 | Not Implemented |
WV0678 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $22,738 | $38,304 | Not Implemented |
WV0678 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,707 | $41,750 | Not Implemented |
WV0678 # 05 Y:2025 | 05 | 2025 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $11,667 | $55,000 | Not Implemented |
WV0678 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,735 | $5,200 | Implemented |
WV0678 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $4,772 | $4,323 | Implemented |
WV0678 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,842 | $11,112 | Implemented |
WV0678 # 12 Y:2025 | 12 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $4,059 | $1,304 | Implemented |
WV0678 # 11 Y:2025 | 11 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,279 | $18,380 | Not Implemented |
WV0678 # 01 Y:2025 | 01 | 2025 | MINIMIZE WATER USAGE | $16,085 | $31,231 | Not Implemented |
WV0678 # 15 Y:2025 | 15 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,433 | $11,061 | Implemented |
WV0678 # 17 Y:2025 | 17 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,209 | $3,002 | Implemented |
WV0678 # 16 Y:2025 | 16 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $304 | Implemented |
WV0678 # 13 Y:2025 | 13 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,130 | $2,676 | Implemented |
WV0678 # 18 Y:2025 | 18 | 2025 | INSULATE BARE EQUIPMENT | $664 | $914 | Implemented |
WV0678 # 19 Y:2025 | 19 | 2025 | REDUCE VENTILATION AIR | $631 | $2,400 | Implemented |
WV0678 # 14 Y:2025 | 14 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $684 | Implemented |
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | Implemented |
WV0678 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,003 | $3,121 | Implemented |
DL0255 # 06 Y:2025 | 06 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,300 | $800 | n/a |
DL0255 # 08 Y:2025 | 08 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $76,162 | $42,000 | n/a |
DL0255 # 09 Y:2025 | 09 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,008 | $0 | n/a |
DL0255 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,077 | $15,000 | n/a |
DL0255 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,190 | $5,500 | n/a |