IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0409 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $45,635 $252,000 Not Implemented
LE0409 # 05 Y:2016 05 2016 USE RADIANT HEATER FOR SPOT HEATING $6,148 $21,000 Implemented
LE0409 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,605 $43,760 Not Implemented
LE0409 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,598 $5,700 Implemented
LE0409 # 02 Y:2016 02 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,416 $2,000 Implemented
LE0409 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $591 $0 Implemented
DL0089 # 02 Y:2012 02 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,675 $27,000 Implemented
DL0089 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,025 $2,275 Not Implemented
DL0089 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $620 $81 Implemented
DL0089 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,880 $0 Implemented
DL0089 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,050 $6,800 Implemented
LE0126 # 08 Y:2002 08 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $653 $0 Not Implemented
LE0126 # 07 Y:2002 07 2002 IMPROVE LUBRICATION PRACTICES $1,283 $200 Implemented
LE0126 # 06 Y:2002 06 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,511 $500 Not Implemented
LE0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,916 $0 Not Implemented
LE0126 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,573 $2,500 Not Implemented
LE0126 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,515 $4,320 Implemented
LE0126 # 01 Y:2002 01 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $6,102 $390 Not Implemented
LE0126 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,467 $0 Not Implemented
RU0141 # 04 Y:1992 04 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,293 $2,500 Not Implemented
RU0141 # 05 Y:1992 05 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,172 $0 Not Implemented
RU0141 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $653 $632 Implemented
RU0141 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,261 $1,500 Implemented
RU0141 # 01 Y:1992 01 1992 IMPROVE LUBRICATION PRACTICES $1,620 $800 Not Implemented
RU0130 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,003 $500 Implemented