IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0346 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,230 $1,143 Implemented
WV0346 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $13,688 Implemented
WV0346 # 03 Y:2006 03 2006 USE RADIANT HEATER FOR SPOT HEATING $4,996 $8,800 Not Implemented
WV0346 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,442 $4,540 Not Implemented
WV0346 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,952 $656 Not Implemented
WV0346 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,502 $737 Implemented
WV0346 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $850 $230 Implemented
LE0148 # 05 Y:2002 05 2002 INSULATE FEEDWATER TANK $121 $260 Implemented
LE0148 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $4,095 Implemented
LE0148 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,804 $535 Not Implemented
LE0148 # 07 Y:2002 07 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,390 $0 Not Implemented
LE0148 # 08 Y:2002 08 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,496 $0 Not Implemented
LE0148 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $750 Implemented
LE0148 # 10 Y:2002 10 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,308 $990 Implemented
LE0148 # 11 Y:2002 11 2002 INSTALL OCCUPANCY SENSORS $210 $150 Not Implemented
LE0148 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $567 $1,000 Not Implemented
LE0148 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $692 $0 Not Implemented
LE0148 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $300 Implemented
LE0148 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $0 Implemented
HO0188 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,465 $5,432 Implemented
HO0188 # 02 Y:1998 02 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,007 $4,000 Not Implemented
HO0188 # 03 Y:1998 03 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,536 $1,376 Implemented
HO0188 # 04 Y:1998 04 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,904 $27,000 Not Implemented
HO0188 # 05 Y:1998 05 1998 $500 $1,000 Not Implemented