IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0008 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $78 $177 Not Implemented
SJ0008 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,195 $77,365 Not Implemented
SJ0008 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $80 $0 Not Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
SJ0008 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $126 $436 Not Implemented
SJ0008 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $265 $344 Implemented
SD0540 # 07 Y:2017 07 2017 OPTIMIZE PLANT POWER FACTOR $1,665 $5,360 Not Implemented
SD0540 # 06 Y:2017 06 2017 USE PHOTOCELL CONTROLS $2,234 $7,400 Not Implemented
SD0540 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,414 $16,180 Not Implemented
SD0540 # 04 Y:2017 04 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,767 $20,883 Not Implemented
SD0540 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,953 $11,528 Not Implemented
SD0540 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $33,558 $136,000 Not Implemented
SD0540 # 01 Y:2017 01 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $42,256 $168,000 Not Implemented
SD0540 # 09 Y:2017 09 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $950 $2,520 Not Implemented
SD0540 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $931 $200 Not Implemented
SD0540 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,457 $1,100 Not Implemented
SF0475 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $9,844 Implemented
SF0475 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $1,340 Implemented
SF0475 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,039 $0 Implemented
SF0475 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $2,990 $822 Implemented
SF0475 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,033 $0 Implemented
SF0475 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $2,001 Implemented
SF0475 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,345 $5,518 Implemented
SF0475 # 08 Y:2015 08 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $57,696 $401,249 Implemented
SF0457 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $898 Implemented