IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2409 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $11,502 $18,750 n/a
LS2409 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,911 $2,088 n/a
LS2409 # 05 Y:2024 05 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $18,443 $20,000 n/a
LS2409 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $162,757 $116,320 n/a
LS2409 # 03 Y:2024 03 2024 INSTALL SUB-METERING EQUIPMENT $13,250 $9,000 n/a
LS2409 # 02 Y:2024 02 2024 REPAIR OR REPLACE STEAM TRAPS $5,037 $2,600 n/a
LS2409 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,382 $165 n/a
LS2317 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $476 Implemented
LS2317 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $344 $45 Implemented
LS2317 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $223 $50 Implemented
LS2317 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $207 $175 Implemented
LS2317 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $535 $4,530 Implemented
LL0332 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,186 $1,815 Implemented
LL0332 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $110 $90 Implemented
LL0332 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $115 $300 Not Implemented
LL0332 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $372 $156 Implemented
LL0332 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $477 $30 Implemented
LL0332 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $350 Implemented
LL0332 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,014 $450 Implemented
LL0135 # 13 Y:2002 13 2002 INSULATE BARE EQUIPMENT $154 $102 Implemented
LL0135 # 01 Y:2002 01 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $546,668 $991,085 Not Implemented
LL0135 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $225,040 $57,600 Not Implemented
LL0135 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,016 $13,170 Implemented
LL0135 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $35,735 $32,655 Not Implemented
LL0135 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN WATER LINES AND VALVES $11,865 $3,600 Implemented