IAC logo
IAC Assessment: LS2409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2024
Principal Product chemicals
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 78
Plant Area (Sq.Ft.) 2,679,915
Annual Production 45,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,437,617 26,244,000 kWh $0.05
Electricity Demand $293,210 48,232 kW-months/year $6.08
Natural Gas $6,031,268 1,889,561 MMBtu $3.19
TOTAL ENERGY COSTS $7,762,095
RECOMMENDED SAVINGS* $214,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,382
Cost:
$165
$1,382 25,125 - - - - $1,382
25,125
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$5,037
Cost:
$2,600
- - - - $5,037 1,578 -
-
kWh
-
-
kW-months/year
$5,037
1,578
MMBtu
03: 2.8117 INSTALL SUB-METERING EQUIPMENT Savings:
$13,250
Cost:
$9,000
$7,217 131,200 - - $6,033 1,890 $7,217
131,200
kWh
-
-
kW-months/year
$6,033
1,890
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$162,757
Cost:
$116,320
$162,757 2,959,227 - - - - $162,757
2,959,227
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$18,443
Cost:
$20,000
- - - - $18,443 5,778 -
-
kWh
-
-
kW-months/year
$18,443
5,778
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,911
Cost:
$2,088
$1,340 24,361 $571 94 - - $1,340
24,361
kWh
$571
94
kW-months/year
-
-
MMBtu
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,502
Cost:
$18,750
$11,502 209,119 - - - - $11,502
209,119
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$214,282
Cost:
$168,923
$184,198 3,349,032 $571 94 $29,513 9,246 $184,198
3,349,032
kWh
$571
94
kW-months/year
$29,513
9,246
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas