Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0148 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $4,095 Implemented
LE0148 # 05 Y:2002 05 2002 INSULATE FEEDWATER TANK $121 $260 Implemented
LE0148 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $692 $0 Not Implemented
LE0148 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,031 $300 Implemented
LE0148 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $0 Implemented
LE0148 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $567 $1,000 Not Implemented
LE0148 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,804 $535 Not Implemented
LE0148 # 08 Y:2002 08 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,496 $0 Not Implemented
LE0148 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $750 Implemented
LE0148 # 10 Y:2002 10 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,308 $990 Implemented
LE0148 # 11 Y:2002 11 2002 INSTALL OCCUPANCY SENSORS $210 $150 Not Implemented
LE0148 # 07 Y:2002 07 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,390 $0 Not Implemented
SF0247 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,500 $500 n/a
SF0247 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,588 $3,019 n/a
SF0247 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,657 $3,491 n/a
SF0247 # 07 Y:2002 07 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,923 $17,600 n/a
SF0247 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,939 $0 n/a
SF0247 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $4,330 $6,240 n/a
SF0247 # 01 Y:2002 01 2002 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $3,149 $11,455 n/a
SF0235 # 07 Y:2002 07 2002 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $9,286 $6,700 Not Implemented
SF0235 # 06 Y:2002 06 2002 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $4,004 $2,461 Not Implemented
SF0235 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,228 $2,805 Implemented
SF0235 # 02 Y:2002 02 2002 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $5,997 $206 Not Implemented
SF0235 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $300 Implemented
SF0235 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $298,248 $112,368 n/a