IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,432

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0083 # 11 Y:1987 11 1987 INSTALL SET-BACK TIMERS $552 $395 Implemented
TN0289 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,485 $105,000 Not Implemented
TN0289 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,373 $4,500 Implemented
TN0289 # 03 Y:1986 03 1986 REPAIR AND ELIMINATE STEAM LEAKS $11,562 $150 Implemented
TN0289 # 04 Y:1986 04 1986 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $143,750 $40,000 Implemented
KU0207 # 01 Y:1986 01 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $164,472 $840,000 Not Implemented
KU0207 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,525 $0 Implemented
KU0207 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,480 $0 Implemented
KU0207 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $9,165 $1,494 Implemented
KU0207 # 05 Y:1986 05 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,099 $12,675 Not Implemented
KU0207 # 06 Y:1986 06 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,637 $6,030 Implemented
KU0207 # 07 Y:1986 07 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,817 $52 Implemented
KU0207 # 08 Y:1986 08 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $1,802 $0 Not Implemented
KU0207 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,433 $0 Implemented
KU0207 # 10 Y:1986 10 1986 INSTALL STEAM TRAP $600 $90 Not Implemented
KU0207 # 11 Y:1986 11 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $547 $0 Implemented
KU0207 # 12 Y:1986 12 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $150 Implemented
KU0207 # 13 Y:1986 13 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $469 $0 Implemented
KU0207 # 14 Y:1986 14 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $454 $20 Implemented
KU0207 # 15 Y:1986 15 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $375 $150 Not Implemented
KU0207 # 16 Y:1986 16 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $128 $100 Implemented
KU0207 # 17 Y:1986 17 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $160 $300 Implemented
CO0069 # 01 Y:1986 01 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $21,903 $109,000 Not Implemented
CO0069 # 02 Y:1986 02 1986 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $7,895 $20,000 Not Implemented
CO0069 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,322 $300 Implemented