IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0830 # 01 Y:2022 01 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,337 $192,000 Not Implemented
MA0830 # 02 Y:2022 02 2022 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $40,790 $80,000 Not Implemented
MA0830 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $15,862 $65,410 Not Implemented
MA0830 # 04 Y:2022 04 2022 MODERATE COOLING TOWER OUTLET TEMPERATURE $9,470 $2,500 Not Implemented
MA0830 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,055 $20,800 Not Implemented
MA0830 # 06 Y:2022 06 2022 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,017 $2,500 Not Implemented
MA0785 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,893 $20,000 Implemented
MA0785 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $2,569 Not Implemented
MA0785 # 03 Y:2017 03 2017 KEEP BOILER TUBES CLEAN $1,014 $1,200 Implemented
MA0785 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $695 $959 Not Implemented
MA0200 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,965 $47,912 Implemented
MA0200 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,450 $2,880 Implemented
MA0200 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,023 $15,974 Implemented
MA0200 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $73 Implemented
MA0200 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $486 $451 Not Implemented