IAC Assessment: MA0830
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0830
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product Roofing shingles
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 152,000
Annual Production 313,583 Tons
Production Hrs. Annual 4,900
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $901,435 8,445,150 kWh $0.11
Electricity Demand $454,837 21,057 kW-months/year $21.60
Electricity Fees $1,080 - $ -
Natural Gas $1,031,865 127,679 MMBtu $8.08
TOTAL ENERGY COSTS $2,404,755
RECOMMENDED SAVINGS* $223,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$118,337
Cost:
$192,000
- - $118,337 14,642 -
-
kWh
$118,337
14,642
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$40,790
Cost:
$80,000
- - $40,790 5,047 -
-
kWh
$40,790
5,047
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,862
Cost:
$65,410
- - $15,862 1,962 -
-
kWh
$15,862
1,962
MMBtu
04: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$9,470
Cost:
$2,500
$9,470 88,723 - - $9,470
88,723
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,055
Cost:
$20,800
$35,055 328,417 - - $35,055
328,417
kWh
-
-
MMBtu
06: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$4,017
Cost:
$2,500
- - $4,017 497 -
-
kWh
$4,017
497
MMBtu
TOTAL RECOMMENDED Savings:
$223,531
Cost:
$363,210
$44,525 417,140 $179,006 22,148 $44,525
417,140
kWh
$179,006
22,148
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas