Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
471
matching recommendationsSIC | 295 | Asphalt Paving And Roofing Materials |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0232 # 03 Y:1992 | 03 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,210 | $670 | Implemented |
CO0232 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $360 | $150 | Implemented |
CO0232 # 05 Y:1992 | 05 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,640 | $3,600 | Implemented |
CO0232 # 06 Y:1992 | 06 | 1992 | UPGRADE CONTROLS ON COMPRESSORS | $780 | $500 | Implemented |
CO0232 # 07 Y:1992 | 07 | 1992 | INSULATE BARE EQUIPMENT | $850 | $1,700 | Implemented |
CO0232 # 08 Y:1992 | 08 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,740 | $6,570 | Implemented |
CO0232 # 09 Y:1992 | 09 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,440 | $2,440 | Implemented |
CO0232 # 10 Y:1992 | 10 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,040 | $6,300 | Implemented |
AM0139 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $570 | $0 | Implemented |
AM0111 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,760 | $0 | Implemented |
AM0111 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $6,300 | $7,100 | Implemented |
AM0111 # 03 Y:1991 | 03 | 1991 | OPTIMIZE PLANT POWER FACTOR | $3,530 | $5,700 | Implemented |
AM0111 # 04 Y:1991 | 04 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,130 | $5,540 | Implemented |
AM0111 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $1,820 | $4,800 | Implemented |
AM0111 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $102 | $34 | Implemented |
OR0107 # 01 Y:1991 | 01 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,299 | $0 | Implemented |
OR0107 # 02 Y:1991 | 02 | 1991 | RECOVER AND REUSE COOLING WATER | $123,679 | $0 | Implemented |
OR0107 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,674 | $10,500 | Implemented |
OR0107 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,622 | $10,000 | Implemented |
OR0107 # 05 Y:1991 | 05 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $10,621 | $0 | Implemented |
OR0107 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $330 | $420 | Implemented |
OR0107 # 07 Y:1991 | 07 | 1991 | OPTIMIZE PLANT POWER FACTOR | $996 | $2,550 | Implemented |
OR0107 # 08 Y:1991 | 08 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $329 | $1,475 | Implemented |
MA0200 # 01 Y:1990 | 01 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $45,965 | $47,912 | Implemented |
MA0200 # 02 Y:1990 | 02 | 1990 | REPAIR OR REPLACE STEAM TRAPS | $4,450 | $2,880 | Implemented |