IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0232 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $1,210 $670 Implemented
CO0232 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $150 Implemented
CO0232 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,640 $3,600 Implemented
CO0232 # 06 Y:1992 06 1992 UPGRADE CONTROLS ON COMPRESSORS $780 $500 Implemented
CO0232 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $850 $1,700 Implemented
CO0232 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,740 $6,570 Implemented
CO0232 # 09 Y:1992 09 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,440 $2,440 Implemented
CO0232 # 10 Y:1992 10 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,040 $6,300 Implemented
AM0139 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $570 $0 Implemented
AM0111 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,760 $0 Implemented
AM0111 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $6,300 $7,100 Implemented
AM0111 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $3,530 $5,700 Implemented
AM0111 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,130 $5,540 Implemented
AM0111 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $1,820 $4,800 Implemented
AM0111 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $34 Implemented
OR0107 # 01 Y:1991 01 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,299 $0 Implemented
OR0107 # 02 Y:1991 02 1991 RECOVER AND REUSE COOLING WATER $123,679 $0 Implemented
OR0107 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,674 $10,500 Implemented
OR0107 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,622 $10,000 Implemented
OR0107 # 05 Y:1991 05 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $10,621 $0 Implemented
OR0107 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $330 $420 Implemented
OR0107 # 07 Y:1991 07 1991 OPTIMIZE PLANT POWER FACTOR $996 $2,550 Implemented
OR0107 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $1,475 Implemented
MA0200 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,965 $47,912 Implemented
MA0200 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,450 $2,880 Implemented