IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1002 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $39,703 $37,000 Not Implemented
OK1002 # 06 Y:2019 06 2019 INSTALL SET-BACK TIMERS $1,083 $802 Implemented
OK1002 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $191,600 $806,420 Not Implemented
OK1002 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,768 $3,646 Implemented
OK1002 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,400 $2,933 Implemented
OK1002 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,343 $2,609 Implemented
OK1002 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $20,293 $28,306 Not Implemented
AR0010 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,459 $1,483 Implemented
AR0010 # 02 Y:1993 02 1993 REPAIR AND ELIMINATE STEAM LEAKS $8,251 $1,400 Implemented
AR0010 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $16,518 Implemented
AR0010 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $85,106 $13,998 Not Implemented
AR0010 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,412 $30 Implemented
LT0090 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $360 $927 Not Implemented
LT0090 # 04 Y:1987 04 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,800 $0 Implemented
LT0090 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $420 $0 Implemented
LT0090 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $782 $146 Implemented
LT0024 # 05 Y:1985 05 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,010 $300 Implemented
LT0024 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $3,430 $2,170 Implemented
LT0024 # 07 Y:1985 07 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $449 $379 Not Implemented
LT0024 # 04 Y:1985 04 1985 DIRECT WARMEST AIR TO COMBUSTION INTAKE $836 $0 Implemented
LT0024 # 03 Y:1985 03 1985 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,160 $1,930 Not Implemented
LT0024 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,930 $0 Implemented
LT0024 # 01 Y:1985 01 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,263 $642 Implemented