Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 295 | Asphalt Paving And Roofing Materials |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0065 # 12 Y:1995 | 12 | 1995 | MODIFY MATERIAL APPLICATION METHODS | $26,000 | $3,000 | Implemented |
AR0065 # 11 Y:1995 | 11 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,827 | $12,500 | Not Implemented |
AR0065 # 10 Y:1995 | 10 | 1995 | USE OPTIMUM THICKNESS INSULATION | $8,894 | $6,480 | Not Implemented |
AR0065 # 09 Y:1995 | 09 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $824 | $50 | Implemented |
AR0065 # 08 Y:1995 | 08 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,959 | $7,500 | Implemented |
AR0065 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $410 | Implemented |
AR0065 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $761 | $420 | Implemented |
AR0065 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,192 | $10,190 | Implemented |
AR0065 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,270 | $0 | Implemented |
AR0065 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,054 | $1,000 | Not Implemented |
AR0065 # 06 Y:1995 | 06 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,284 | $1,000 | Implemented |
AR0065 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $705 | $250 | Implemented |
TN0250 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $30,492 | $4,000 | Implemented |
TN0250 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $9,426 | $300 | Implemented |
TN0250 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,460 | $300 | Implemented |
TN0212 # 02 Y:1984 | 02 | 1984 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,363 | $10,000 | Not Implemented |
TN0212 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $1,503 | $498 | Implemented |
TN0212 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,547 | $500 | Implemented |
TN0212 # 04 Y:1984 | 04 | 1984 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $2,727 | $10,200 | Not Implemented |
TN0212 # 03 Y:1984 | 03 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $2,822 | $1,240 | Not Implemented |
TN0212 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,487 | $400 | Implemented |
TN0134 # 01 Y:1982 | 01 | 1982 | COVER OPEN TANKS | $12,000 | $3,500 | Not Implemented |
TN0134 # 02 Y:1982 | 02 | 1982 | INSULATE BARE EQUIPMENT | $700 | $4,000 | Not Implemented |
TN0134 # 03 Y:1982 | 03 | 1982 | OPTIMIZE PLANT POWER FACTOR | $10,000 | $12,000 | Not Implemented |