Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsSIC | 2951 | Asphalt Paving Mixtures And Blocks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0630 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM THICKNESS INSULATION | $8,920 | $12,000 | Not Implemented |
CO0630 # 05 Y:2009 | 05 | 2009 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,830 | $10,599 | Not Implemented |
CO0630 # 04 Y:2009 | 04 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,070 | $9,010 | Not Implemented |
CO0630 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,380 | $46,700 | Not Implemented |
CO0630 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,410 | $2,000 | Not Implemented |
CO0540 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,710 | $200 | Implemented |
CO0540 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $5,600 | $18,700 | Not Implemented |
CO0540 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $1,310 | $200 | Implemented |
CO0540 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $579 | $1,136 | Implemented |
CO0540 # 06 Y:2004 | 06 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,020 | $500 | Implemented |
CO0540 # 01 Y:2004 | 01 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,340 | $8,790 | Implemented |
CO0426 # 08 Y:1998 | 08 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $92,990 | $250,000 | Implemented |
CO0426 # 09 Y:1998 | 09 | 1998 | $73,500 | $200,000 | Not Implemented | |
CO0426 # 05 Y:1998 | 05 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $2,770 | $500 | Implemented |
CO0426 # 04 Y:1998 | 04 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,420 | $4,303 | Implemented |
CO0426 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,590 | $25,000 | Not Implemented |
CO0426 # 02 Y:1998 | 02 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,390 | $9,870 | Implemented |
CO0426 # 01 Y:1998 | 01 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,960 | $5,700 | Implemented |
CO0426 # 06 Y:1998 | 06 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $2,380 | $6,000 | Not Implemented |
CO0426 # 07 Y:1998 | 07 | 1998 | BURN WASTE OIL FOR HEAT | $1,620 | $5,420 | Implemented |
CO0322 # 07 Y:1995 | 07 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,650 | $7,690 | Not Implemented |
CO0322 # 02 Y:1995 | 02 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,530 | $85,020 | Not Implemented |
CO0322 # 06 Y:1995 | 06 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,320 | $500 | Implemented |
CO0322 # 05 Y:1995 | 05 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,570 | $19,930 | Implemented |
CO0322 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $12,270 | $16,040 | Not Implemented |