IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

500

matching recommendations
Reset
SIC 2952 Asphalt Felts And Coatings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0083 # 10 Y:1987 10 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,596 $20,000 Not Implemented
CO0083 # 11 Y:1987 11 1987 INSTALL SET-BACK TIMERS $552 $395 Implemented
CO0069 # 01 Y:1986 01 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $21,903 $109,000 Not Implemented
CO0069 # 02 Y:1986 02 1986 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $7,895 $20,000 Not Implemented
CO0069 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,322 $300 Implemented
CO0069 # 04 Y:1986 04 1986 INSTALL TURBULATORS $3,185 $3,000 Not Implemented
CO0069 # 05 Y:1986 05 1986 REPAIR AND ELIMINATE STEAM LEAKS $2,429 $200 Implemented
CO0069 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $3,409 $0 Not Implemented
CO0069 # 07 Y:1986 07 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,274 $4,400 Not Implemented
CO0069 # 08 Y:1986 08 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $718 $500 Implemented
LT0024 # 01 Y:1985 01 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,263 $642 Implemented
LT0024 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,930 $0 Implemented
LT0024 # 03 Y:1985 03 1985 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,160 $1,930 Not Implemented
LT0024 # 04 Y:1985 04 1985 DIRECT WARMEST AIR TO COMBUSTION INTAKE $836 $0 Implemented
LT0024 # 05 Y:1985 05 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,010 $300 Implemented
LT0024 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $3,430 $2,170 Implemented
LT0024 # 07 Y:1985 07 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $449 $379 Not Implemented
TN0134 # 01 Y:1982 01 1982 COVER OPEN TANKS $12,000 $3,500 Not Implemented
TN0134 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $700 $4,000 Not Implemented
TN0134 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $10,000 $12,000 Not Implemented
UD0018 # 01 Y:1981 01 1981 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $610 $45 Not Implemented
UD0018 # 02 Y:1981 02 1981 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $9,469 $32,000 Not Implemented
UD0018 # 03 Y:1981 03 1981 USE OPTIMUM THICKNESS INSULATION $445 $0 Implemented
UD0018 # 04 Y:1981 04 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94 $60 Implemented
UD0018 # 05 Y:1981 05 1981 INSULATE BARE EQUIPMENT $10,990 $10,000 Not Implemented