IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0172 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,057 $840 Implemented
AS0172 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,118 $0 Implemented
AS0172 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,671 $960 Implemented
AS0172 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,903 $34,100 Implemented
NV0055 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,239 $200 Implemented
IA0142 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,297 $63 Implemented
IA0142 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $262 Implemented
IA0142 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $900 $1,362 Implemented
IA0142 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $444 Implemented
WI0265 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,546 $60,000 Implemented
WI0265 # 05 Y:1996 05 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,490 $6,500 Implemented
WI0265 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,039 $6,400 Implemented
KG0057 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,958 $17,130 Implemented
KG0057 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,160 $4,878 Implemented
KG0057 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,289 $5,200 Implemented
KG0057 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,408 $375 Implemented
KG0057 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $957 $170 Implemented
KG0057 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $829 $650 Implemented
KG0057 # 08 Y:1996 08 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,148 $0 Implemented
KG0057 # 10 Y:1996 10 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,200 $0 Implemented
OK0494 # 03 Y:1996 03 1996 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $12,077 $3,040 Implemented
OK0494 # 04 Y:1996 04 1996 REPAIR AND ELIMINATE STEAM LEAKS $5,851 $3,600 Implemented
OK0494 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $689 $30 Implemented
OK0494 # 06 Y:1996 06 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $469 $1,000 Implemented
AM0273 # 01 Y:1996 01 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $167,000 $73,600 Implemented