Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,816
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0117 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,153 | $0 | Implemented |
RU0117 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,912 | $518 | Implemented |
RU0117 # 03 Y:1991 | 03 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,681 | $700 | Implemented |
RU0117 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $827 | $200 | Implemented |
RU0117 # 05 Y:1991 | 05 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $552 | $135 | Implemented |
SD0002 # 01 Y:1991 | 01 | 1991 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $4,725 | $3,100 | Implemented |
SD0002 # 02 Y:1991 | 02 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $11,147 | $300 | Implemented |
SD0002 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,086 | $5,550 | Implemented |
SD0002 # 04 Y:1991 | 04 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $580 | $600 | Implemented |
SD0002 # 05 Y:1991 | 05 | 1991 | KEEP LAMPS AND REFLECTORS CLEAN | $752 | $3,780 | Implemented |
RU0115 # 01 Y:1991 | 01 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,350 | $0 | Implemented |
RU0115 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,064 | $87 | Implemented |
RU0115 # 03 Y:1991 | 03 | 1991 | IMPROVE LUBRICATION PRACTICES | $1,353 | $800 | Implemented |
RU0115 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,855 | $201 | Implemented |
RU0115 # 05 Y:1991 | 05 | 1991 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,087 | $6,840 | Implemented |
RU0115 # 06 Y:1991 | 06 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,343 | $0 | Implemented |
RU0115 # 07 Y:1991 | 07 | 1991 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,041 | $2,700 | Implemented |
RU0115 # 08 Y:1991 | 08 | 1991 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $5,372 | $875 | Implemented |
MA0212 # 01 Y:1991 | 01 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,099 | $2,649 | Implemented |
MA0212 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $3,090 | $3,593 | Implemented |
MA0212 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,737 | $9,055 | Implemented |
MA0212 # 04 Y:1991 | 04 | 1991 | DISCONNECT BALLASTS | $1,580 | $1,875 | Implemented |
MA0212 # 05 Y:1991 | 05 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,665 | $5,000 | Implemented |
MA0212 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $393 | $161 | Implemented |
MA0212 # 07 Y:1991 | 07 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,146 | $79,350 | Implemented |